Campus Notice for Mason Square

  • September 12, 2023

    The sidewalk along Fairfax Drive directly in front of the Fuse at Mason Square construction site will be closed starting this week through the rest of the fall semester. The pedestrian bridge between Washington Boulevard (near the north entrance to Vernon Smith Hall) and the FDIC plaza will have intermittent closures during September.

  • August 25, 2023

    Road closures on Founders Way North between the Van Metre Garage entrance and the west entrance to Vernon Smith Garage have been extended through Friday, Sept. 1. This section of roadway will be fully closed during this time.

  • August 18, 2023

    As the fall 2023 semester begins, Mason students, faculty and staff are reminded that traffic on and around the Fairfax Campus greatly increases, especially during the first few weeks of the semester. This campus parking and transportation guide with information on Mason Shuttles, visitor and non-permit parking options, biking, carpooling and other transit options will help minimize potential parking and traffic delays.