- February 14, 2024
"It is a long letter because we have heard that community members first and foremost are eager to learn specifics about this process. Future communications will be briefer, but I am addressing the biggest call first: for transparency."
- January 31, 2024
The internal directional signage is under repair in David King Hall and Exploratory Hall on the Fairfax Campus, and in Colgan Hall on the SciTech Campus.
- January 25, 2024
Upcoming traffic impacts and closures related to construction at Mason Square in late January and early February 2024.
- January 25, 2024
Rivanna River Way and nearby sidewalks have reopened near the Hub. Repairs are complete after a water main break. The ADA ramp at the main entrance to the Hub is also available.
- January 22, 2024
On George Mason University's Fairfax Campus, Rivanna River Way is temporarily closed near the Hub for repairs after a water main break. Sections of sidewalk at the main entrance to the Hub are currently closed, including the ADA ramp at that location.
- January 19, 2024
The Hub and Rivanna River Way are temporarily closed for repairs after a domestic water main break to the Hub. The building and road closure will remain in effect until Monday, Jan. 22, at 8 a.m.
- January 9, 2024
Due to weather conditions, the road closure previously scheduled for this weekend on Founders Way North has been rescheduled.
Founders Way North will be closed between the Van Metre Garage entrance and the west entrance to Vernon Smith Garage from Friday, Jan. 26, through Monday, Jan. 29. This section of roadway will be closed while a tower crane is removed from the construction site for Fuse at Mason Square. - January 2, 2024
A Mason civil engineering student has already landed a job upon graduation…and his first assignment will be Project Engineer for a major new building on the Fairfax campus.
- November 15, 2023
Contractors will work to clear a storm water pipe blockage at the intersection of Patriot Circle and Mattaponi River Lane on Thursday, Nov. 16. There will be traffic controls and heavy equipment in the area between 7 a.m. and 4 p.m.
- November 10, 2023
Landscaping work is underway on the plaza at Mason Square through Friday, Nov. 17.